January 2009 Rides

<br

Top: A soggy Milton after our rainy Jan 24 ride.
Bottom: January 31, 2009 - For our next ride, Rich finally arrived on time to join us and Milton suggested attempting the "Loop" i.e. up the San Gabriel bike path, up the canyon, along the East fork road and up the backside of Glendora Mt Road, down the front side back to the bike path and voila...all downhill with tailwinds and home(sure). 9:00am and Rich and Milt along the path with the Whittier hills in the background.
4 of 12

52

back
next